Electronic Information Technology Application
2022-05-13
In the way of on-site operation, according to the relevant materials and work assignments provided by the arena, complete the following tasks:
1.According to the material list, assembly drawings and other technical data provided by the venue, complete the assembly and functional debugging of the self-balancing model, to fulfill the smooth operation of the flight system
2.According to the functional description,circuit schematic diagram and other technical information provided by the venue, using Keil uVision 5 software development environment to design the program source code (part), and download the program to the STM32L052 chip to fulfill the intelligent parking management function of the three-dimensional garage.
3.Professionalism
Including equipment operation specification; material utilization efficiency, wiring and material loss; usage condition of tools, instruments and meters; safe and civilized production at the competition site; reasonable arrangement of work.
Search

Service Tel:
+086-010-53056984
Time:09:00-17:30
Email:bricsskill@126.com
     jiakebj@gmail.com
Copyright © BRICS Future Skills Challenge (京ICP备09017895号 京ICP备09017895号-6)
REGISTER CONTACTS